Change proposal 009 – Water Sector Documents –– Modification of Design and Construction Specification: Mains flushing and local practices – Final decision

Change proposal 009 – Water Sector Documents –– Modification of Design and Construction Specification: Mains flushing and local practices – Final decision

Published date: July 28, 2022
Closing date:

Download

About Consultation

Fair Water Connections (FWC) submitted this change proposal on 2 February 2022 to the Independent Water Adoption Panel (the Panel), with the Panel publishing the proposal on its website on the same day. The change proposed by FWC concerns the water sector guidance on practices undertaken by water companies when newly constructed mains are commissioned.