Signed Notice amending Project Licence - March 2022

Modification of the Project Licence of Bazalgette Tunnel Limited - March 2022

488.76 KB - PDF

Download

Published

16th March, 2022

Kind

Publication

Type

Thames tideway

Detail

Modification of the Project Licence of Bazalgette Tunnel Limited. Made on 7 March 2022. Coming into effect on 8 March 2022. The Water Services Regulation Authority, in exercise of the power conferred on it by section 17IA of the Water Industry Act 1991 (“the 1991 Act”) (as has effect under paragraph 5 of the Water Industry (Specified Infrastructure Projects) (English Undertakers) Regulations 2013 (“the SIP Regulations”)), after giving notice as required by section 17IA(3) of the 1991 Act, (as has effect under the SIP Regulations), hereby makes the modifications described in Schedule 1 attached hereto to the Project Licence of Bazalgette Tunnel Limited as an infrastructure provider (“the Infrastructure Provider”), the Infrastructure Provider having consented to these modifications.